This case study supports our Leppington service area page and shows how One X Done scopes real residential construction cleaning around the builder's programme, site condition and handover date.
The primary service for this project was Estate Handover Clean, with the same builder-focused standard used across pre clean, handover and sparkle stages.
Project Snapshot
Leppington, South West Sydney NSW
Multi-lot project home handover sequence
Same-standard handover across consecutive lots
Site Context
Leppington estate releases run staggered handover dates, with project home builders rolling through 30 to 80 home programmes. The cleaning brief here is rhythm-driven, with the same crew expected to hold a consistent standard across consecutive lots on the same street.
Scope Delivered
Pre clean was sequenced ahead of fit off, with the handover clean booked the day before each lot's supervisor walk through. Construction dust, sliding door tracks, kitchen joinery interiors, wet areas, glass and floor finish were all detailed to inspection standard, lot to lot.
- Multi-lot handover sequence delivered
- Camden and Liverpool council inspection cycles respected
- Same crew across pre clean, handover and sparkle
Handover Result
The builder held handover dates across consecutive Leppington lots without splitting cleaning across contractors. Buyers walking into consecutive homes saw the same finish standard.
For related planning, see the PCA and OC inspection cleaning guide, builders clean cost guide and sparkle vs handover clean guide.